- Switching court of Golden Telecom and Data Group
Equipment of operators is mounted, on the courts in separated place, also there is optical fiber channel

- Climate-control and ventilation
Double-pipe system “chiller – funkoil” ( “Clivet” , Italy). Combined extract-and-input system with air recuperation (“Alteko” Czech Republic)

- Proper modern boiler house
Proper modern boiler house started to work in 2008

- Main feeder switchboard
Main feeder switchboard is installed for input of electricity and as backbone site. Main feeder switchboard is performed like on-floor cabinet with two interchanged inputs which are assembled with the elements of firm “Schneider Electric” and “Muller”. Floor’s switchboards are made with the same equipment. Designed capacity of one working place is 300 watt or 50 watt per 1 sq.m. In case of necessity, there is possibility of increasing of capacity. Illumination is 400 lux per 1 sq.m. in the offices.

- 2 proper transformer substation
Power supply of the complex is provided from 2 independent electrical inputs.
- Lift’s equipment
Modern passenger lifts produced by firm “OTIS”. In the building “B” there are 4 lifts with carrying capacity 1000 kg and
In the building “A” – 1 lift with carrying capacity 1000 kg and 1 lift with carrying capacity 630kg
|